Missouri River Advisory Committee

Governor Sam Brownback established the Missouri River Advisory Committee to assist his administration in the review and assessment of the recent flooding along the river to avoid a similar flood event in the future.

Multiple efforts are underway for repair and recovery for people affected by the devastating Missouri River flooding that occurred this year.

“While the Missouri River Basin Governors continue to meet and provide input to the U.S. Army Corps of Engineers, it also is important to have a Kansas advisory group to assist my administration with the review of this event,” Governor Brownback said. “Many of these stakeholders either have a demonstrated interest and involvement in Missouri River issues or were severely affected by the devastation this flood caused.” 

In addition to the Governor the Committee will also advise Tracy Streeter, Director of the Kansas Water Office, who was appointed by the Governor to serve on the Corps’ Missouri River Task Force. 

 Advisory Committee Membership

map levee

Reports

Missouri River Mainstem System 2011-2012 Annual Operating Plan - U.S. Army Corps of Engineers, January 2012

Levee Name County River Mile Request for Assistance Received Damage Feature Status (as of 1/12/2012)
Wolcott Drainage Dist. Section 3 WY 381.3 to 382.3 7/30/2011 Breach PIR completed 1/11/2012
Wolcott Drainage Dist. Section 2 WY 383.7 to 386.4 7/30/2011 Breach Field PIR data to KC 12/27/2011
Wolcott Drainage Dist. Section 1 WY 383.7 to 386.4 7/30/2011 Overtopping PIR completed 1/11/2012
Kansas Dept. of Corrections LV 388.0 to 394.0 7/25/2011 Breach Field assessment approximately 75% complete; restart assessment wk of 1/3/2012 (weather delay)
MRLS 440-R AT/DP 391.2 to 401.35 8/5/2011 Seepage PIR completed on 1/4/2012
Grape-Bolin-Schwartz Levee Assoc. LV 406.2 to 409.9 9/29/2011 Breach Field assessment approximately 50% complete; restart assessment wk of 1/3/2012
Henry Pohl Levee LV 409.9 to 412.3 11/4/2011 Overtopping Assessment tentative start wk of 1/3/2012
MRLS 471-460-R DP 441.7 to 456.6 9/2/2011 Seepage Funded; contract award late January, complete late May, 2010
MRLS 482-R DP 458.0 to 467.0 10/11/2011 Scour/Seeding Field assessment approximately 50% complete
MRLS 500-R DP 496.8 to 501.8 8/19/2011 Embankment Seepage PIR completed on 1/4/2012
Clyde, Kansas CD   8/4/2011 Sloughing PIR approved 1/10/2012

News

Release - Missouri Basin Levees Receive Surge in Repairs Funding - U.S. Army Corps of Engineers

Release - Governor Appoints Missouri River Advisory Committee

Letter-  Input on Draft Missouri Mainstem System 2011-2012 Annual Operating Plan

 

 

Links

Photo Gavins Point

Gavins Point - 2011

Photo Gavins Point

Gavins Point - 2011

Photo Leavenworth County Tour

Leavenworth County - 2011

Photo Leavenworth County

Leavenworth County - 2011